Fishing Creek Rehabilitation Project
Basic Information
| Project Type: | Stream Restoration |
| Project Status: | Completed |
| Start Date: | 4-2016 |
| End Date: | 9-2016 |
| Cost: | 107000 |
Sponsor Information
| Sponsor Name: | Windsor Borough, Windsor Township, Lower Windsor Township, Red Lion Borough |
| Sponsor Address: | 2 East Main Street, Windsor, PA 17366 |
| Contact Name: | Donna Martin, Secretart/Treasurer |
| Contact Phone: | 717-244-6615 |
| Contact Email: | djmwindsor@comcast.net |
Geography
| Jurisdiction(s): | Windsor Boro |
| Latitude: | 39.91571 |
| Longitude: | -76.58159 |
| Project Area: | 0.2 |
| HUC 12 Watershed: | 020503061705 |
Reductions (lbs/yr)
| Nitrogen: | 100 |
| Phosphorus: | 34 |
| Sediment: | 27125 |
Description
| Rehabilitation of approximately 500' of Fishing Creek on Windsor Borough property from Gable Avenue to Baseball alley, including removal of existing deteriorated stone walls, installation of fish habitats (modified mud sills & stone cross vanes with double throat, installation of a new pedestrian bridge, stream embankment grading, natural stone steps, and conversion of an existing stormwater aqueduct into a stormwater BMP facility including a improved culvert pipe crossing and rip-rap apron. |
Additional Information
| Joint / Multi-municipality Project: | Yes |
| Secured Funding: | Yes |
| Designs Prepared: | Yes |
| Benefits: | Yes |
| Within Impaired Watershed: | Yes |
| Ownership Type: | Public |
| NPDES Permit Required | Yes |
| Publicly Accessible | Yes |
Notes
| Project was funded through the York County Stormwater Consortium, York County PA DEP Grant funds and the York County Commissioners Act 13 Fund. Project is located on the edge of a public park. Permits required include PA DEP General Permits 01, 03, 04, & 11. Work is 100% complete |
Land Use / Land Cover (LULC) Values
| Individual land use / land cover classes | Within project area (acres) | Within treatment area (acres) |
|---|