Fishing Creek Study – Pond

Basic Information
Project Type: Stormwater Basin
Project Status: Planned
Start Date: 9-2019
End Date: 10-2025
Cost: 350000
Geography
Jurisdiction(s): Windsor Twp
Latitude: 39.91203
Longitude: -76.59676
Project Area: 2.16
HUC 12 Watershed: 020503061705
Reductions (lbs/yr)
Nitrogen: 3
Phosphorus: 0
Sediment: 107
Description
Look at possibility of installing a stormwater basin west of the Borough to control stormwater runoff through Fishing Creek within the Borough. Working with ACOE on possible funding. At the present time the ACOE is completing a preliminary study to determine if this project is worthy to move forward. If it is determined to be worthy the ACOE will award additional funds for a detailed study/design.
Additional Information
Joint / Multi-municipality Project:Yes
Secured Funding:No
Designs Prepared:No
Benefits:No
Within Impaired Watershed:Yes
Ownership Type:Public
NPDES Permit RequiredYes
Publicly AccessibleYes
Notes
This project if funded would require a PA DEP NPDES permit and associated DEP General permits. ACOE is presently conduction a preliminary study of the corridor.