Horace Mann Ave -BMP #1

Basic Information
Project Type: bio retention beds
Project Status: Planned
Start Date: 04-06-2018
End Date: 08-03-2018
Cost: 100000
Geography
Jurisdiction(s): Red Lion Boro
Latitude: 39.89485
Longitude: -76.60682
Project Area: 0.13
HUC 12 Watershed: 020503060602
Reductions (lbs/yr)
Nitrogen: 15
Phosphorus: 1
Sediment: 500
Description
The Borough is working with the School District to create bio retention beds to take runoff from the surrounding properties and streets.
Additional Information
Joint / Multi-municipality Project:Yes
Secured Funding:Yes
Designs Prepared:No
Benefits:Yes
Within Impaired Watershed:Yes
Ownership Type:Public
NPDES Permit RequiredNo
Publicly AccessibleYes
Notes
This work is intended to be made part of the street resurfacing and storm sewer upgrades for Horace Mann Avenue. The partnership with the schoold district will allow the construction of a highly visible project that can be used for educational purposes.