Pine Run – Felton Bor Stream Restoration

Basic Information
Project Type: Stream Restoration
Project Status: Planned
Start Date: 04-01-2019
End Date: 04-30-2020
Cost: 104005
Geography
Jurisdiction(s): Felton Boro
Latitude: 39.85627
Longitude: -76.56238
Project Area: 10.45
HUC 12 Watershed: 020503061301
Reductions (lbs/yr)
Nitrogen: 149.3
Phosphorus: 59.5
Sediment: 67489.8
Description
Stream Restoration along Pine Run in Felton Borough
Additional Information
Joint / Multi-municipality Project:No
Secured Funding:No
Designs Prepared:No
Benefits:Yes
Within Impaired Watershed:Yes
Ownership Type:Both
NPDES Permit RequiredYes
Publicly AccessibleYes
Notes
Secondary benefit would be that it runs along the Gazebo Park in the borough.
Land Use / Land Cover (LULC) Values
Individual land use / land cover classes Within project area (acres) Within treatment area (acres)