Stream/Drainage Improvements – Lions Club and Barclay Properties

Basic Information
Project Type: Stream Restoration
Project Status: Planned
Start Date: 06-03-2019
End Date: 01-01-2020
Cost: 339200
Geography
Jurisdiction(s): Windsor Boro
Latitude: 39.91753
Longitude: -76.58419
Project Area:
HUC 12 Watershed: 020503061705
Reductions (lbs/yr)
Nitrogen:
Phosphorus:
Sediment:
Description
The project includes the existing Lions Club project which consists of the removal of 190 LF deteriorated 24" CMP, and extending the project upstream onto the Barclay property. The entire length of the project has expanded to 1600 LF. The project will consist of stream channel BMPs designed to stabilize the stream and reduce sediment loading to Fishing Creek.
Additional Information
Joint / Multi-municipality Project:No
Secured Funding:No
Designs Prepared:No
Benefits:Yes
Within Impaired Watershed:Yes
Ownership Type:Private
NPDES Permit RequiredYes
Publicly AccessibleYes
Notes
The project is currently on private property but will be public in the future and connects to a public park downstream. Matching funds are being sought. This project is an expansion of Project #83 (Lions club) upstream for an overall length of 1,600 LF.