Basic Information
Project Type: Create a stabilized stream channel including plantings for filtering.
Project Status: Planned
Start Date: 4-2018
End Date: 10-2018
Cost: 125000
Geography
Jurisdiction(s): Windsor Boro
Latitude: 39.91716
Longitude: -76.58271
Project Area: 0.15
HUC 12 Watershed: 020503061705
Reductions (lbs/yr)
Nitrogen: 13.5
Phosphorus: 12.2
Sediment: 8078.3
Description
Elimination of a deteriorated CMP and creation of a stabilized stream channel. Looking for funding
Additional Information
Joint / Multi-municipality Project:No
Secured Funding:No
Designs Prepared:No
Benefits:Yes
Within Impaired Watershed:Yes
Ownership Type:Private
NPDES Permit RequiredYes
Publicly AccessibleNo
Notes
This project would improve the grounds of the local Lions Club. This project would require a PA DEP General Permit. At the present time the area where the deteriorated CMP is located is very wet most of the time. The creation of a stabilized streat/drainage channel through this area would allow for additional runoff and potentially dry up some of the unusable areas. This proposed channel would also act as a better BMP than the existing or new culvert pipe.
Land Use / Land Cover (LULC) Values
Individual land use / land cover classes Within project area (acres) Within treatment area (acres)