York City Industrial Park -stream work

Basic Information
Project Type: stream restoration
Project Status: Planned
Start Date: 03-02-2018
End Date: 08-31-2018
Cost: 300000
Geography
Jurisdiction(s): York City
Latitude: 39.98161
Longitude: -76.75884
Project Area: 2.89
HUC 12 Watershed: 020503060705
Reductions (lbs/yr)
Nitrogen: 500
Phosphorus: 240
Sediment: 150000
Description
Restore and stabilize a stream running through an area with extremely impervious area coverage and pollution potential. the area represents the headwater of a large tributary into the City.
Additional Information
Joint / Multi-municipality Project:Yes
Secured Funding:No
Designs Prepared:No
Benefits:No
Within Impaired Watershed:Yes
Ownership Type:Both
NPDES Permit RequiredYes
Publicly AccessibleYes
Notes
This project could reduce flooding onto route 30 (PaDOT), and would need to be coordination with surrounding municipalities.
Land Use / Land Cover (LULC) Values
Individual land use / land cover classes Within project area (acres) Within treatment area (acres)